Offshore Grid Hollandse Kust (noord) - Documentation
The future grid connection 'Hollandse Kust (noord)' consists of one connection of 700 MegaWatt (MW). The offshore platform will be connected by cables to the high-voltage substation in Beverwijk. The offshore grid connection will be operational in 2023.
A permit for the development of Hollandse Kust (noord) Wind Farm Zone Site V (700 MW) will be issued by the Dutch Government. Offshore wind farm developers can apply for this permit via a tender procedure. The documentation below regarding the offshore grid connection serves as background information for offshore wind farm developers to prepare their bid.
NOTE:
The RVO website provides information about the tender and permit to develop Hollandse Kust (noord) Wind Farm Zone (HKNWFZ).
On offshorewind.rvo.nl you can find all available site data on soil, wind & water conditions and obstructions on HKNWFZ.
Contact
General questions:
General questions can be submitted to netopzee@tennet.eu.
Q&A:
Please download here the answers to the questions TenneT has received related to the wind tender Hollandse Kust (noord). Last update: 25 June 2020.
Platform information package:
The platform information package (including plotplans) for Hollandse Kust (noord) can be requested by wind developers preparing for the offshore wind tender Hollandse Kust (noord) via netopzee@tennet.eu.
1._Model_Agreements
2._Annexes_to_the_Model_Agreements
3._Technical_papers
Annex A to Memo Overplanting HKN provides the soil resistivity analysis for Hollandse Kust (noord), November 2019.
DownloadAdditional to Memo Overplanting and Annex A. Please note, this Cigré paper provides further in-depth insight in the technical assumptions behind the calculations on overplanting, for your information.
DownloadSingle line diagram, as referred to in Annex 2 of both Realisation Agreement and Connection & Transmission Agreement.
DownloadOffshore Grid Connection Scheme, as referred to in Annex 2 of both Realisation Agreement and Connection & Transmission Agreement.
DownloadLay-out Offshore WPO Control room, as referred to in Annex 2 of both Realisation Agreement and Connection & Transmission Agreement.
DownloadA desk study has been carried out to assess the scour development and conceptual scour protection layout at the offshore high voltage substation HKN, as well as the amplification of the hydrodynamic load in the cable areas in the vicinity of the structures. Report "Scour development and conceptual scour protection layout at OHVS HKN and HKWa" prepared by Deltares.
DownloadThis memo specifies the root loci of the calculated harmonic impedances at the 380 kV substation Beverwijk, the connection point to the onshore grid. These root loci can be used by the wind farm developers to verify their compliance with the harmonic requirements.
DownloadThis memo specifies the root loci of the calculated harmonic impedances at the 66 kV offshore point of common coupling. As referred to in Annex 3 of both Realisation Agreement and Connection & Transmission Agreement.
Download4._Model_Crossing_Agreement
If the inter-array cables of site V near and/or cross 220 kV export cables of TenneT, a proximity and/or crossing agreement shall be agreed between the parties. For information purposes, TenneT publishes this model Crossing Agreement. The Crossing Agreement may be subject to any amendments that TenneT may deem necessary. A Proximity Agreement will – where applicable - be based on the same principles as incorporated in the Crossing Agreement, however taking into account the differences between a cable crossing and a situation where cables will be installed in each other's proximity.
Download5._Presentations
Update by TenneT during a workshop organised by RVO/EZK, 15 January 2020 in Zwolle.
DownloadUpdate by TenneT during the workshop "Offshore Wind Energy" organised by RVO/EZK, 18 April 2019 in Zandvoort.
DownloadUpdate by TenneT during the workshop "Dutch Offshore Wind Energy" organised by RVO/EZK, 8 October 2019 in Amsterdam.
Download6._Other_information
National regulation (Besluit van 23 maart 2016, houdende regels met betrekking tot de schadevergoeding bij niet-beschikbaarheid van het net op zee).
DownloadTenneT beoogt met deze leidraad een heldere, transparante en efficiënte procedure in te voeren voor de wijze waarop TenneT de aanvragen tot schadevergoeding zal gaan behandelen, welk bewijs minimaal zal worden verlangd en welke termijnen zullen worden gevolgd.
DownloadThis document contains answers to the questions TenneT has received related to the wind tender Hollandse Kust (noord). Last update: 25 June 2020.
DownloadThe Ministerial ruling (Regeling schadevergoeding net op zee van 22 maart 2016) on compensation in case of delay and/or unavailability of the offshore grid.
Download